Rational Expressionsmedium
0:00.0

A manufacturing machine takes 40v5\frac{40}{v-5} hours to complete a batch of parts, where vv is the machine's speed in parts per hour. If the machine's speed is increased by 55 parts per hour, the time taken becomes 40v\frac{40}{v}. If the time difference between these two scenarios is 22 hours, which equation models this situation?